Gotvand – Shazand 400KV TL project was one of toughest projects in terms of topography and the location. The distance between two points is 322KM Which passed three provinces. On the way of this line the employer of the project (TPP) is a leading company in the power sector, was in charge to stabilize the national grid by connecting a thermal power plant. Transmission tower used in this project is designed to carry a triple bundle and 850 towers needed to connect these two points.